Reliability.com: Ammonia Plant Case Study
This case study takes place in a Louisiana ammonia plant. The plant had above industry average downtime (116 Days of downtime compared to an industry average of 49.5 Days (worst record in the world for this type of facility).
One major reason was the plant had unexpectedly lost the ammonia compressor twice in one year, primarily because of lack of lead time information. Supervision was trying to monitor vibration on equipment running 36,000 rpm using once a month hand held velocity readings which is not recommended for high speed large equipment. The lack of continuous information allowed large gaps about equipment health to exist. This degrades the ability of employees to have any lead time to bring equipment down in a safe manner. Best practices recommended radial eddy current proximity probes which measure shaft displacement 24/7 along with preset alarm levels that will provide critical information for decision making.
The preventive initiatives were ineffective due to the rescheduling of preventive maintenance work in an effort to make up lost production needed to meet customer orders on time. As a result major breakdowns were occurring at the worst times with costly damage and extended repair times.
The predictive maintenance effort was ineffective because in most cases there was no lead time provided to schedule work. The technicians were not taking readings at the scheduled intervals and equipment was failing catastrophically. Because there was a lack of readings being taken no trending was being performed therefore, no lead time was provided. The high amount of reactive work was causing supervision to pull hourly technicians to help with repairs.
Root cause analysis was being performed inadequately and often stopping at the physical (broken component) and human roots (placing blame). The depth of the analyses did not dig into the system roots where recommendation leverage could be provided.
Process data in many cases lacked the ability to help operators see approaching unfavorable trends. The data was in some cases missing, inadequate, or misleading the operators.
Part inventory management was being affected by the high failure rates as well. It caused supervision to horde parts and stash them all over the plant, just in case a failure occurred and they didn’t have the part(s) in stock. Machinery and part balancing was also a problem because only the high speed equipment was receiving quality balancing (always through a third party for balancing) All other equipment was either not balanced or balanced incorrectly. Often pumps came from stores with high vibration.
After all these problems were addressed:
- Net dollar savings in three years was $36,000,000
- 19.4 Days downtime after one year (best in the world in one year!)
- 10 Days downtime after 2 years
All of these conditions were created because of reacting to unscheduled outages. When lacking proaction, priority, and focus in an organization this kind of environment is created robbing you of the ability of using time effectively. All of your reliability activities as well as production are negatively affected.
About the Author
Robert (Bob) J. Latino is former CEO of Reliability Center, Inc. a company that helps teams and companies do RCAs with excellence. Bob has been facilitating RCA and FMEA analyses with his clientele around the world for over 35 years and has taught over 10,000 students in the PROACT® methodology.
Bob is co-author of numerous articles and has led seminars and workshops on FMEA, Opportunity Analysis and RCA, as well as co-designer of the award winning PROACT® Investigation Management Software solution. He has authored or co-authored six (6) books related to RCA and Reliability in both manufacturing and in healthcare and is a frequent speaker on the topic at domestic and international trade conferences.
Bob has applied the PROACT® methodology to a diverse set of problems and industries, including a published paper in the field of Counter Terrorism entitled, “The Application of PROACT® RCA to Terrorism/Counter Terrorism Related Events.”
Recent Posts
A Step-by-Step Guide to Using Root Cause Analysis Tools for Improved Reliability
How to Choose the Right Root Cause Analysis Tool for Your Reliability Program
How to Perform Root Cause Investigations?
Post-Incident Analysis for Enhanced Reliability
Root Cause Analysis Software
Our RCA software mobilizes your team to complete standardized RCA’s while giving you the enterprise-wide data you need to increase asset performance and keep your team safe.
Request Team Trial
Root Cause Analysis Training
Your team needs a common methodology and plan to execute effective RCA's. With both in-person and on-demand options, our expert trainers will align and equip your team to complete RCA's better and faster.
View RCA Courses
Reliability's root cause analysis training and RCA software can quickly help your team capture ROI, increase asset uptime, and ensure safety.
Contact us for more information: