Reliability resources

Subscribe for updates
Image

by Bob Latino

Updated: January 5, 2022

NEW FEATURES To PROACTOnDemand!

Reading Time: 2 minutes

NEW FEATURES To PROACTOnDemand! {{cta(’85b48632-6501-48ce-9dc3-fc15b4de925f’)}}

Read More
Image

by Bob Latino

Updated: January 5, 2022

Why Trending Data is Important

Reading Time: 2 minutes

Why Trending Data is Important Case Study: Predictive Activities – Trending {{cta(‘236ffbef-9183-4718-9aa0-b9b2e33e85c9’)}} This case history takes place in a packaging facility in Virginia. The packer on module E5 was checked for vibration integrity during a pre- machine care evaluation. A problem was detected in the folding arm gearbox. The frequency characteristics indicated a bearing was deteriorating. This seems very straight

Read More
Image

by Bob Latino

Updated: January 5, 2022

Should a Procedure = Practice?

Reading Time: 2 minutes

Should a Procedure = Practice?  I often ask my classes ‘If we follow our procedures to the letter, do nothing more and nothing less; would we optimize our system productivity, safety and reliability?’ The answer is NO. If anyone on this forum has ever worked in a union environment in the manufacturing world, they will attest that doing this (follow

Read More
Image

by Bob Latino

Updated: April 23, 2024

Understanding the Principles of Reliability

Reading Time: 8 minutes

Understanding the Principles of Reliability Abstract: The Reliability Approach… “Something understood and practiced by engineers and highly specialized technicians,” is apt to be the first reaction of the line supervisor, “certainly not an area where I can be expected to become involved.” Although this reaction is understandable; nothing is farther from reality. Let’s explore why in this paper. Please read

Read More
Image

by Bob Latino

Updated: January 5, 2022

‘De-Flate Gate’ & RCA

Reading Time: 2 minutes

‘De-Flate Gate’ & RCA Originally published on January 23, 2015  

Read More
Image

by Bob Latino

Updated: May 2, 2024

Root Cause Analysis: The Justification Game

Reading Time: 4 minutes

Root Cause Analysis: The Justification Game Part 2 of 2 Maintenance Solutions In last month’s introductory article, we discussed some of the barriers to selling not only the concept of Root Cause Analysis (RCA) but also the recommendations generated as a result of these analyses. We also laid the framework for making better predictions by generating and accessing better data—namely

Read More
Image

by Bob Latino

Updated: April 23, 2024

Root Cause Analysis: Investment or Expense?

Reading Time: 6 minutes

Root Cause Analysis: Investment or Expense? Abstract: In times that promise to be a financial challenge for many corporations, we must make decisions as to where to invest our scarce dollars and where to cut from our current operations.  When faced with these decisions, we must be realistic and pragmatic about how short-term decisions impact our long-term goals.  Yes, when times are

Read More
Image

by Bob Latino

Updated: January 5, 2022

PROACTOnDemand: Collect Evidence In The Field Using Mobile Devices

Reading Time: < 1 minute

PROACTOnDemand: Collect Evidence In The Field Using Mobile Devices Managing an investigation itself is often the most arduous task of conducting a Root Cause Analysis (RCA). The new PROACTOnDemand Investigation Management System allows investigators to collect field evidence on mobile devices and upload them to their respective RCA’s in the cloud.  This makes conducting RCA’s much more efficient and effective for only

Read More
Image

by Bob Latino

Updated: January 5, 2022

What is RCA? Separating the Tools from the Methodologies

Reading Time: 5 minutes

What is RCA? Separating the Tools from the Methodologies By Bob Latino, CEO, Reliability Center, Inc. Abstract: If we have heard it once, we have heard it a million times – “let’s do an RCA on that failure”. The problem here is that phrase will mean something different to everyone who says it. What is an RCA? That is a question even the notable

Read More
Image

by Bob Latino

Updated: November 17, 2023

The Keys to a High Reliability Organization: Priority, Proaction & Focus

Reading Time: 8 minutes

Abstract: RCA has an image problem and needs a public relations agent to reshape its reputation in the healthcare industry! RCA is primarily viewed as a reactive tool. This perception is how we have been conditioned by various regulatory agencies that require us to do RCA under very specific circumstances (usually when something very bad has occurred). When such ‘Sentinel Events’ occur, then we

Read More
Image

by Bob Latino

Updated: January 5, 2022

Corporate Memory: Capturing Employee Experience Before they Retire in the Tropics!

Reading Time: 3 minutes

Corporate Memory: Capturing Employee Experience Before they Retire in the Tropics! Robert J. Latino, CEO, Reliability Center, Inc., www.reliability.com Why do our Generally Accepted Accounting Principles (GAAP) dictate that equipment is an asset and our employees are liabilities? Don’t our executives always tell us ‘our people are our greatest assets?’ How come our financials don’t support their assertion? How come during

Read More
Image

by Bob Latino

Updated: January 5, 2022

The ‘Soft Side’ of RCA: Management’s Role in ‘Effective’ Training

Reading Time: 5 minutes

The ‘Soft Side’ of RCA: Management’s Role in ‘Effective’ Training By Robert J. Latino, CEO, Reliability Center, Inc. Abstract: In an era of rapidly advancing technology, the need for training to keep up is imperative. But training alone is not the panacea to a facility’s problems. Management’s must be aware that the environment in which their people work, will either progress or obstruct

Read More